Do you need an Updated As-Built plan?
This is required in an annual inspection by LGU / PEZA
a. Architectural Plan, Architect
b. Structural Plan, Structural Engineer
c. Mechanical Plan, #PME
d. Plumbing, Master Plumber, Sanitary Engineer
e. Electrical Plan, Professional Electrical Engineer #PEE
f. Electronics Plan Professional Electronics Engineer #PECE
Econtractor Construction OPC
Expert Preventive Maintenance Services for commercial and industrial electrical systems
🔧 Our Services Include:
- Thermal Imaging / Scanning of electrical panels
- Megger Testing (Insulation Resistance Testing)
- Power Quality Analysis (PQA)
- Electrical Load Balancing & System Coordination
- Capacitor Bank Supply & Installation
- Planned Shutdown Maintenance for Facilities
📍 We Serve:
Metro Manila, Pampanga, Bulacan, Cavite, and surrounding provinces
🏭 Ideal for:
Factories, warehouses, malls, BPO offices, high-rise condos, hospitals, commercial buildings
❓
- “Where can I get thermal scanning for electrical panels in the Philippines?”
- “How do I reduce my electric bill with a capacitor bank?”
- “What’s the price of shutdown preventive maintenance?”
- “Who does Megger testing for buildings?”
📞 Contact Us:
Phone: 09169806008
Email: engr.manansala@gmail.com
Website / FB Page: econtract





No comments:
Post a Comment